Release Order Definitions: Added: May have been installed previously; now expected to work Four States C+B (Crash and Burn) Alpha--locker owners prepare to build their stuff Beta--locker owners expect to build cleanly and test Release--OUT TO THE FIELD For each state, there are entry and exit criteria. To exit development and enter C+B, required software is: vendor release and patches required by vendor includes necessary X functionality xterm mwm twm console AFS (for Athena 8.0, this is version 3.4a (GA)) Kerberos hesiod tcsh Install Process (Server, etc.) Update Process To enter C+B, system must pass: Install Update Login To exit C+B, required alpha software is added. C compiler a debugger zephyr motd MH lpr attach Login Emacs rcs imake sendbug Athena Development Environment libraries (X, Motif) include files To enter alpha, system must pass: alpha tests, including a make using Athena imake rules During alpha, developers and locker owners prepare to build their stuff. In particular, we expect Andrew mkserv gnu Also during alpha, briefings for other development team members should be provided, including: changes and problem areas in port "architecture diagrams" or other helps to orient people to peculiarities of port To exit alpha, required beta software is added and required bug fixes incorporated. FORTRAN compiler olc (x, tty, olta, owl, olc_answers) Athena Man TeX ( LaTeX, dvips, xdvi, dvi2tty ) Andrew/EZ ( ezviewer, ez2ascii ) olh delete xmh eos, neos notes discuss, xdsc dash perl register enscript MIT libraries software SIS xscreensaver techinfo (x, tty) xinfo xmitdir xcluster, cview moira (listmaint, mailmaint, blanche) infoagents (mosaic, netscape, etc.) Postscript previewer To enter beta, system must pass: beta tests, including tests of alpha bug fixes. During beta, developers and locker owners expect to build cleanly and test. In most cases, we advise locker owners to rebuild at this point to insure libraries, include files, and other changes are kept in sync. Also during beta, Faculty Liaisons, Consultants, Documentation, Training should be provided with: question and answer meetings list of changes in port list of expected problem areas for users provide support for these groups in getting ready for port To exit beta, required release software is added and required bug fixes incorporated. Major Locker Software SAS Xess Maple Tecplot AutoCAD Frame Matlab S-Plus 3.091 software 6.021J software netnews lotteries To enter release, system must pass: release tests, including tests of alpha and beta bug fixes. mkserv operates correctly? DONE! Test plans for transitions are being developed.