               Minutes of the SIPB Meeting of 23 June 1980

	The meeting was called to order at 19:30 by William M. York.
		
	In attendance were ZRM, RK, WMY, RMP, J9, ACW, GMP, JSL, c|,
		ALAN, RDM.
			
	Late were: SEL, DGHP, Naha, BEE, HGA, and RLL.

	The minutes of the meeting of 16 June were read and accepted as
		corrected.  

	*** USER INTERRUPT ***
	*
	*	Marc K. Freedman wants $300 to maintain a data base
	*	for the Macroengineering Research Group.  He will
	*	write an RDMS front end (learning PL/1 in the
	*	process).  He is being paid by UROP, and has a note
	*	from them to the effect that  they cannot pay for
	*	computer time.  $100 was autoed already, and we will
	*	defer further allocation until we find out how he's
	*	doing with the first hundred.
	*
	*** TPURRETNI RESU ***

	Treasurer's Report:

		We've spent roughly $7000 so far this month, according
		to system mail from the absent treasurer.

	Chairman's Report:

		The chairman continued to try unsuccessfully to reach
		Jean Bonney about the Center's policies concerning
		non-Multics use of the Spinwriter.

		The chairman spoke to Norma McGavern from the UROP
		office, about relations between UROP and the SIPB.
		UROP is no longer funding students for computer time. 

		Bill Roberts talked to Wes' secretary about whether
		the Center could back him in his efforts to get a room
		to teach COBOL to CETA people in.  RK suggested to him
		that he speak to his supervisor, and maybe his
		supervisor would vouch for him.  Another possibility
		would be to go to ESP, and they could back him.  ALso,
		the SIPB could write a letter to Scheduling and try to
		unwedge things.

	Office Report:

		There is still an office, in case we didn't know.

		We found out who CWG(?)L is.

		RLL put the Commands and Active Functions out of
		user's sight.  Censure.

	Computer Services:

		The line printer, card reader/punch, and printer
		controller for the new Multics configuration arrived,
		but were not signed for, so they were taken away
		again.  They will be brought back tomorrow.  They are
		the first scraps we have seen of the new hardware.  We
		are told that the rest has been shipped.  It is really
		coming, really.  We estimate installation within a
		week of delivery, in the optimal case.  We don't want
		to think about the pessimal case.

		All 370 applications have been being taken
		automatically to the meeting.  It was moved and
		seconded that this not be the case, and that 370
		applications be made autoable.  This would be done in
		order to help users who must use the 370, and who at
		present must wait until Monday to get started.  The
		auto limit would be $200, just like on Multics.
		Signatures in blood would still be extorted from our
		370 users.  The motion passed.

	Should SIPB Secede and Get Their Own Computer?:

		Should the SIPB work toward the goal of acquiring its
		own computer, thus breaking their dependence on the
		IPS?

		This question is timely because it is rumored that
		Honeywell will soon announce moderately priced Multics
		mainframes that may very well fall within our
		(extended) financial capabilities.  This is still a
		probabilistic question, since Honeywell seems nowhere
		near making a final decision.

		A system has been announced, the DPS 8/20,
		manufactured in Japan, that will run GCOS.  The
		question is whether Honeywell will produce the
		mythical DPS 8/20 M, which will run Multics.

		A DPS 8 processor, 1MW memory, a 501 disk, with 2
		spindles, holding 250K Multics records, 2 tape drives
		(800/1600 BPI), and a FNP with 32 asynchronous lines
		minus modems --- all this would cost about $556,133.
		This is GMP's calculation, and is an optimistic
		estimate.  Maintenance would be $2336 per month.  This
		would be a GCOS system, and is only an approximation
		to the cost of the hypothetical Multics system.

		Alternatively we could get a 3 year lease at $15883 /
		month.

		We should remember that the capacity of this system
		would only be a fifth to a fourth of the capacity of
		the Multics we are used to.  This means only fifteen
		simultaneous users.

		An immense amount of this cost is the front end, at
		$160K.  This cost could perhaps be saved by using an
		11-based Palterplexer.  This would reduce the cost for
		the entire system to $395,723, maintenance to $1482 /
		month, leasing on a 3 year basis $11,235 / month.

		We are MIT.  We can get hardware at GSA prices, and we
		don't know what percentage savings this means.  But on
		top of this we save another 13% as part of the terms of
		the Honeywell / MIT contract.  We may be able to save
		more by making special arrangements with Honeywell.

		So, one question is, is this system worth the money?
		Do we get enough computrons to the dollar to make it
		worth consideration?

		(SEL and DGHP came in during this explanation from
		GMP.)

		We should remember that the DPS 8/20 cannot be
		configured with more than 1M of memory.  Also, it can
		only be upgraded to the 8/44 level, which is only a
		50% enhancement, at which point you hit a dead end as
		far as enhancement goes.

		As far as software prices go, you get the system tape
		with your processor. This is a completely bare system,
		with no user commands.  The next thing you get is the
		executable library (>sss).  These are all of the
		ordinary commands.  These would cost a four-digit
		figure per month.  We don't know what this figure
		would be, as Honeywell itself has not yet decided.
		The software must be leased and cannot be bought.

		Then comes unbundled or separately priced software.
		This includes Fortran, Mail, Emacs, etc., as well as
		the RJE software which we use presently to run the
		Spinwriter.

		We hope that we could piggyback on some comprehensive
		software contract that MIT already has with Honeywell.
		We are not, however, familiar with the terms of
		these agreements.  If we cannot do this, we can expect
		to pay on the order of $10K to $20K per month.  When
		you buy the software, you get the source.

		It should be mentioned here that there are other
		possibilities in terms of what hardware we should get.
		We should investigate these other possibilities in
		detail.  These possibilities include VAX/VMS,
		VAX/UNIX, 11/70/UNIX, 20/TWENEX, Primus, Data General
		Eagle, and any other systems that can run 40 users
		maximum for $0.5M list price or less.  IBM should be
		given a chance to speak as well.  MTS is an outside
		possibility.

		The two questions we need to ask of manufacturers are,
		"What would it cost us to run 40 users?", and "How
		many users can we run for $500K?".

		One thing to keep in mind is that the Committee for
		the Future seemed to say that the SIPB would get a
		computer in the Future, and we want some control over
		which.

		Issues over whether or not we want a computer at all
		will be deferred to a future meeting, since we have
		already spent 45 minutes discussing this.  The
		organization is congratulated on its restraint.

		Naha and BEE came in at the end of this discussion.

	Telecommunications Report:

		c| talked to Sylvia Something at the Student Center
		Library, and told her that we really do want the
		terminal room carpeted.  There is storage space
		available at the Library for us to keep our equipment
		during the carpeting.

		JSL talked to Leo Ryan about moving our terminals into
		the IPC terminal room for the duration of the
		carpeting.  Leo Ryan doesn't know as usual.

		We have not found out about the modifications to the
		ADM 3A.  Dave Moon is the person who knows this sort
		of thing.

	Publications Report:

		J9 will read the new Emacs handout and suggest
		modifications to Bernie.

		Dormitory terminal-room documentation should be
		compared with the ideal list on the blackboard and be
		augmented to the extent that this is needed, by buying
		manuals for the places that need them.  This needs to
		be done this week so that we can buy manuals on this
		year's budget.  Get the revision number of the manual
		and a list of addenda, when you make the documentation
		inspection.  We will certainly need MPM commands
		manuals for each dormitory (8 of them).  GMP will
		order them.

	R/O Report:

		HGA has yet to start making arrangements for the tour.

		The Freshman letter must be printed and sent to the
		right people this week.  ACW will do it.

		Naha has to write a letter to MIT Telecommunications
		Office for two telephones for the Midway.

	Other:

		IBM entered the word processing market.  Their entry
		has a terminal, two floppy drives, a 50K word
		dictionary, and a Selectric printer, with
		communications capabilities to IBM mainframes.  User
		interface is a complete unknown.  List price is -- get
		this -- $8000.

		Phil Earnhardt would like to send us some Coop money
		to maintain contact.  But maybe we could save him the
		money by putting him on the SIPB project.  The
		consensus seems to be that he would be an asset to SIPB
		project and should be added to it.

		RDM will be running some benchmarks on Multics.

		RLL came in at this point.

	Applications:

		The Graduate Student Council wants $100 to continue to
		run their accounting program on Multics.  They have a
		budget of $30K per year.  Deferred, with the strong
		suggestion that they find an alternate source of
		funding, or at least send a representative to our next
		meeting.

		Robert A. Proctor wants $100 to type up a paper on
		some combinatorial aspects of Bruhat orders.  He has
		had $300 before for typing math papers.  Given.

		Attention: Alan Strong has used none of the $100
		allocated him for hacking thesis.

		Ali Ahmadi had $80 added to his Coop account.

		Jane Martini had $75 added to her Coop project.

		Total appropriations: $1205 without Coop
		  Autoed: $1105
		    Student: $1005
		    370: $100
		  To Meeting: $100, all Student.

		Coop: $155

		Concourse will be allowed to buy a tape on our
		account, for use with their recently acquired 11.

	Other Other:

		Be careful when you lock your bike.  Moon and Penny
		locked their bikes to a signpost and had their rear
		wheels stolen.

		DEC installed their first 11/44 at LL-ASG last week.
		It runs.

		J9's car got its inspection sticker.

		RK is looking for a part for his car -- a hydraulic
		frobulator pulley main drive belt type thingie frob.
		Any leads will be welcome.

		The Concourse/LOGO 11/45 is doing all right.  It is
		running RT11 as an interim measure.  They hope to be
		bringing up the TV system shortly.  If anyone knows of
		a company named Per Data (Peripheral Data), pointers
		will be useful, as the 11 has a tape drive from them,
		and no one can make it work.

		WMY, SEL, and RM and DGH P have moved into their
		summer accommodations.

		An all-night hacking session for a last-ditch annual
		report will be held Saturday night and will last forever.
		
		RDM had a run-in with a taxi.

	The meeting was adjourned at 2215.
 
 
		     Minutes taken and submitted by Allan C. Wechsler
 
 

;; Local Modes:
;; Mode:TEXT
;; LISP ) Hack:1
;; Auto Fill Mode:
;; Fill Column:70
;; Fill Prefix:		
;; END:

